1. Create a Simple Schedule
How long does this take? About 15 minutes.
βWho does this? The Contractor.
β
Click below for step by step instructions. π
βWeb - https://help.conslog.com/en/articles/4166349-how-to-create-your-project-schedule-add-and-edit-milestones-activities-to-your-project-schedule
Two Minute Video Demo
2. Create Report(s)
How long does this take? About 5 minutes.
βWho does this? The Architect and Contractor.
β
Click below for step by step instructions.
Web - https://help.conslog.com/en/articles/3935435-how-to-create-a-construction-report-how-to-add-pictures
Two Minute Video Demo
Note: You can attach files and photos to your reports.
β
3. Create an Action Item (Submittals, RFI, Change Order Request)
How long does this take? About 5 minutes.
βWho does this? The Architect and Contractor.
β
Click below for step by step instructions.
Three Minute Video Demo
4. Attach Documents to your project (Plans, Specifications, other Documents)
How long does this take? About 1 minute.
βWho does this? The Architect and Contractor.
β
Click below for step by step instructions.
βWeb - http://help.conslog.com/en/articles/4180823-how-to-attach-files-documents-to-your-project-construction-module